Open Air Demolition Banner

Sewer and Septic System Considerations

Sewer connections may require approved capping, while abandoned septic systems can involve pumping, decommissioning, and inspections. These procedures are not interchangeable. Follow applicable local health department, utility provider, and permitting requirements before proceeding.

Common mistakes include assuming a service has been disconnected simply because it is turned off, overlooking private underground lines, or allowing utility markings to expire before excavation begins.

Frequently Asked Questions About Utility Disconnection

Who Shuts Off the Gas Before Demolition?

The gas utility provider must coordinate the appropriate service disconnection. Property owners should obtain confirmation that the line has been safely disconnected or capped before demolition.

How Long Do Utility Disconnections Take?

Timelines vary by provider, property conditions, and required inspections. Contact utility companies early, as permanent disconnections may take longer than routine service shutoffs.

Do I Need a Utility Locate for Concrete Removal?

Yes, if removing concrete involves excavation or disturbing the ground beneath it. Underground utilities may be located directly below slabs, sidewalks, and driveways.

Plan Your Demolition With Iron Mountain Demolition

Preparing utilities is an essential part of a safe, organized demolition project. Iron Mountain Demolition helps property owners throughout Colorado Springs plan for demolition and excavation while accounting for important site preparation requirements.

Explore our related guides on demolition permits and regulations, our demolition process, and excavation services, or contact our team to discuss your upcoming project.

Iron Mountain Demolition Demo Colorado Springs USAFA

Preparing Utilities for Safe Demolition in Colorado Springs

Before demolishing a building, gas, electricity, water, sewer, and communication services must be properly disconnected, shut off, or capped by authorized providers. Underground utilities must also be identified through Colorado 811 before excavation begins. Completing these steps helps prevent dangerous utility strikes, unexpected service interruptions, and costly demolition delays.

Why Utility Disconnection Is Essential Before Demolition

Utility disconnection is one of the most important preparations for any demolition project. Active gas lines can create fire or explosion hazards, while energized electrical connections pose serious risks to workers and nearby properties. Damaging water, sewer, or communication lines can also interrupt service to neighboring homes and businesses. In Colorado Springs, many properties receive services through Colorado Springs Utilities, although providers vary throughout the surrounding region. Property owners should identify each utility provider and coordinate disconnections well before demolition begins. Scheduling is equally important. Some utilities require advance notice, inspections, or additional work before confirming a permanent disconnection. At Iron Mountain Demolition, we encourage customers to address these requirements early to avoid unnecessary project delays.

Understanding Colorado 811 Utility Locates

Before excavation or ground-disturbing demolition, contact Colorado 811 to request underground utility markings. Colorado’s current guidance requires submitting a locate request at least three full business days before digging, excluding the day of the request. Public utility locates are free, but they generally identify only lines maintained by participating utility operators. Privately owned connections, such as certain lines serving detached structures, may require a separate private utility locating service. Locate markings also have a limited validity period. For projects extending beyond 30 days, arrange an updated locate request before the existing marks expire.

Coordinating Utility Shutoffs and Demolition Preparation

A successful demolition project requires more than submitting a locate request. Property owners and contractors should coordinate several steps before work begins:

  1. Request utility locates: Submit a Colorado 811 ticket before planned excavation.
  2. Allow time for marking: Wait for utility operators to respond and mark their facilities.
  3. Confirm utility locations: Review markings and identify any private lines requiring additional locating.
  4. Schedule disconnections: Coordinate gas, electric, water, sewer, and communication shutoffs with the appropriate providers.
  5. Verify completion: Obtain confirmation that necessary disconnections and capping procedures are complete.
  6. Begin demolition: Proceed once utility safety requirements and other project approvals have been satisfied.
AHERA Certified Equipment Operators

Step 3 — Planning & Scheduling

After your site assessment, we develop a customized work plan tailored to your timeline and project type. During this stage, our team handles permit coordination (when applicable), schedules the crew, and secures the necessary equipment and roll-off dumpsters. You’ll receive a full project timeline along with your expected start date, so you always know what comes next. Effective demolition planning and project scheduling keep everything moving smoothly and predictably.

Step 4 — Demolition or Excavation Work

When the work begins, our crew mobilizes promptly with all equipment ready to go. Iron Mountain performs structural demolition, excavation services, and dirt work using safe, controlled methods that meet local regulations and industry best practices. Throughout the project, we maintain real-time communication, keeping you updated on progress and any discoveries on-site. We also sort and separate materials when possible, allowing for efficient hauling and environmentally responsible disposal.

AHERA Certified Equipment Operators
Demolition Services Colorado Springs Iron Mountain